ESET Solar System Applying in Desert
Delivery time: 2024.12.09

Just completed! 603MW #ESET #fixedtiltmountingsystem applying in the #solar & wind power integration project in #desert environment: high ultraviolet, high load, strong dust, large temperature difference, etc.

 

With psammophyte planting under the #PV panel, it turns a new ecological model, i.e. Power Generation over the panel + Sand Control under the panel. 

 

The construction of large wind/PV power station projects in desert, and Gobi areas will undoubtedly become one of the major measures to promote clean and #lowcarbon energy transformation, and achieve #carbonneutrality in the future.

 

#ESET

#PV #Solar

#fixedtiltmountingsystem

#desertPV

#lowcarbon

#carbonneutrality

ESET Solar System Applying in Desert (1)
ESET Solar System Applying in Desert (4)
ESET Solar System Applying in Desert (3)
ESET Solar System Applying in Desert (2)

Leave Your Message

    * Name

    * Email

    Phone/WhatsAPP/WeChat

    * What I have to say